Skip to content
PaperFren

Sewer overflows spike chemicals in marine harbours

Open paper intelligence

In two protected English harbours, CSO discharge days raised mixed chemical burdens 25- to 43-fold above a dry-spring baseline, with imidacloprid exceeding PNEC.

Source

Chemical profiling of surface water and biota in protected marine harbours impacted by combined sewer overflows

Uhlhorn J, Ng KT, Barron LP, et al. · Environment international · 2025

doi.org/10.1016/j.envint.2025.109417Read the full paper ↗2 citationscc by

What they did

Authors sampled 21 harbour sites in a dry March, then resampled four CSO-near sites through wetter August/November, quantifying 67 pharmaceuticals/pesticides/markers in water (and pooled biota) against event-duration-monitoring overflow records.

What they found

March means ranged 0.12–129 ng/L (citalopram high); 22 of 67 compounds were at >50% of sites. At Site 16, daily means rose from 6.6 ng/L in March to 281 ng/L on an August CSO day (25–43×). Cocaine (~15×) and benzoylecgonine (~20×) tracked overflows; imidacloprid RQs averaged 3.9 (March) and reached 9.3. Spikes returned toward baseline within 24 h.

The limits

What it doesn't show

Four intensively resampled sites cannot represent all UK harbours. Biota were pooled, so individual organisms are not dose-mapped. PNEC exceedances are screening-level, not measured ecological damage.

Key terms

Combined sewer overflow (CSO)
A discharge of mixed sewage and stormwater when sewers exceed capacity.
PNEC / risk quotient
Predicted no-effect concentration; RQ>1 means measured levels exceed that screening threshold.
CSO markers
Compounds such as cocaine, benzoylecgonine, caffeine, and poorly removed drugs that spike with overflows.
Imidacloprid
A neonicotinoid insecticide that exceeded PNEC in nearly every harbour water sample.
Event duration monitoring (EDM)
Utility records of when CSOs operate, used here to match chemistry to discharge days.

Flashcards

1 / 10

Research intelligence for this paper

See its role on concept claims, tensions it is part of, placement history, and related discoveries.

Open paper intelligence

Quiz yourself

1 / 6

CSO discharge days raised Site 16 chemical burden by about:

Common questions

Does rain always mean more chemicals?

Loads rose when CSOs actually discharged; some pesticides fell at one site while sewage markers soared.

How fast did concentrations recover?

Toward baseline within about 24 hours after the overflow.

Was this a dirty industrial harbour only?

No. Sampling was in protected marine harbours still receiving CSOs and WWTP effluent.

Which insecticide was a chronic exceedance?

Imidacloprid, with mean RQs of 3.9 (March) and 3.3 (November).

More on Water quality